Please be advised that we will be performing general maintenance/servicing to all In-Suite Furnace/AC units. Mechanical contractors will be on site to inspect and provide maintenance services over multiple days. This is a mandatory service and while residents do not need to be present, we do ask that for the comfort of any pets, please ensure they are secured, if you will not be at home.
December 12th – December 16th & December 19th - 21th
As this is a sizeable project, we have planned to systematically work through each building. Below are the projected dates for each building. The plan is 2 floors per day, starting at the bottom of the building. The third day is set to be a buffer period, to allow for any potential issues or concerns that may arise.